Format
Sort by
Items per page

Send to

Choose Destination

Links from PubMed

Items: 1 to 20 of 138

1.

How the novel integration of electrolysis in tidal flow constructed wetlands intensifies nutrient removal and odor control.

Ju X, Wu S, Huang X, Zhang Y, Dong R.

Bioresour Technol. 2014 Oct;169:605-613. doi: 10.1016/j.biortech.2014.07.051. Epub 2014 Jul 18.

PMID:
25103037
2.

Intensified nitrogen and phosphorus removal in a novel electrolysis-integrated tidal flow constructed wetland system.

Ju X, Wu S, Zhang Y, Dong R.

Water Res. 2014 Aug 1;59:37-45. doi: 10.1016/j.watres.2014.04.004. Epub 2014 Apr 16.

PMID:
24784452
3.

Intensified nitrate and phosphorus removal in an electrolysis -integrated horizontal subsurface-flow constructed wetland.

Gao Y, Xie YW, Zhang Q, Wang AL, Yu YX, Yang LY.

Water Res. 2017 Jan 1;108:39-45. doi: 10.1016/j.watres.2016.10.033. Epub 2016 Oct 14.

PMID:
27863737
4.

Dynamics of organic matter, nitrogen and phosphorus removal and their interactions in a tidal operated constructed wetland.

Li C, Wu S, Dong R.

J Environ Manage. 2015 Mar 15;151:310-6. doi: 10.1016/j.jenvman.2015.01.011. Epub 2015 Jan 10.

PMID:
25585144
5.

Enhanced nitrogen removal in constructed wetlands: effects of dissolved oxygen and step-feeding.

Li F, Lu L, Zheng X, Ngo HH, Liang S, Guo W, Zhang X.

Bioresour Technol. 2014 Oct;169:395-402. doi: 10.1016/j.biortech.2014.07.004. Epub 2014 Jul 9.

PMID:
25069093
6.

Enhanced long-term organics and nitrogen removal and associated microbial community in intermittently aerated subsurface flow constructed wetlands.

Fan J, Zhang J, Guo W, Liang S, Wu H.

Bioresour Technol. 2016 Aug;214:871-875. doi: 10.1016/j.biortech.2016.05.083. Epub 2016 May 24.

PMID:
27246456
7.

Dynamics of nitrogen transformation depending on different operational strategies in laboratory-scale tidal flow constructed wetlands.

Chang Y, Wu S, Zhang T, Mazur R, Pang C, Dong R.

Sci Total Environ. 2014 Jul 15;487:49-56. doi: 10.1016/j.scitotenv.2014.03.114. Epub 2014 Apr 23.

PMID:
24768911
8.
9.

Vertical flow constructed wetlands: kinetics of nutrient and organic matter removal.

Pérez MM, Hernández JM, Bossens J, Jiménez T, Rosa E, Tack F.

Water Sci Technol. 2014;70(1):76-81. doi: 10.2166/wst.2014.183.

PMID:
25026582
10.

Kinetic modelling of nitrogen and organics removal in vertical and horizontal flow wetlands.

Saeed T, Sun G.

Water Res. 2011 May;45(10):3137-52. doi: 10.1016/j.watres.2011.03.031. Epub 2011 Mar 23.

PMID:
21481434
11.

Removal of organic carbon and nitrogen in a membraneless flow-through microbial electrolysis cell.

Hussain A, Lebrun FM, Tartakovsky B.

Enzyme Microb Technol. 2017 Jul;102:41-48. doi: 10.1016/j.enzmictec.2017.03.013. Epub 2017 Mar 31.

PMID:
28465059
12.

[Rural sewage treatment performance of constructed wetlands with different depths].

Liu C, Hu H, Zhang J, Huang X, Shi H, Qian Y.

Huan Jing Ke Xue. 2003 Sep;24(5):92-6. Chinese.

PMID:
14719267
14.

[Effect of reed rhizosphere on nitrogen and COD removal efficiency in subsurface flow constructed wetlands].

Dai YY, Yang XP, Zhou LX.

Huan Jing Ke Xue. 2008 Dec;29(12):3387-92. Chinese.

PMID:
19256373
15.
16.

Removal of organic matter, nitrogen and faecal indicators from diluted anaerobically digested slurry using tidal flow constructed wetlands.

Guo L, Lv T, He K, Wu S, Dong X, Dong R.

Environ Sci Pollut Res Int. 2017 Feb;24(6):5486-5496. doi: 10.1007/s11356-016-8297-2. Epub 2016 Dec 27.

PMID:
28028703
17.

Pollutant removal within hybrid constructed wetland systems in tropical regions.

Yeh TY, Wu CH.

Water Sci Technol. 2009;59(2):233-40. doi: 10.2166/wst.2009.846.

PMID:
19182332
18.

Enhanced denitrification and organics removal in hybrid wetland columns: comparative experiments.

Saeed T, Sun G.

Bioresour Technol. 2011 Jan;102(2):967-74. doi: 10.1016/j.biortech.2010.09.056. Epub 2010 Sep 21.

PMID:
20934326
19.

Highly efficient removal of nitrogen and phosphorus in an electrolysis-integrated horizontal subsurface-flow constructed wetland amended with biochar.

Gao Y, Zhang W, Gao B, Jia W, Miao A, Xiao L, Yang L.

Water Res. 2018 Aug 1;139:301-310. doi: 10.1016/j.watres.2018.04.007. Epub 2018 Apr 4.

PMID:
29660619
20.

The performance of the intensified constructed wetlands for organic matter and nitrogen removal: A review.

Ilyas H, Masih I.

J Environ Manage. 2017 Aug 1;198(Pt 1):372-383. doi: 10.1016/j.jenvman.2017.04.098. Epub 2017 May 8. Review.

PMID:
28494426

Supplemental Content

Support Center