Table 1Timeline of performance feedback reports and capacity building

Performance feedback reportsPerformance feedback reports
#1#2#3#4#5#6
Patient discharge dates10-1-00 to 3-31-014-1-01 to 9-30-0110-1-01 to 3-31-024-1-02 to 9-30-0210-1-02 to 3-31-034-1-03 to 9-30-03
Reports senta2-15-0211-24-028-16-035-28-0410-30-0410-30-04
Capacity building
ManualsSurgical site infectionsPerioperative cardiac eventsCentral venous catheter complicationsAnticoagulant complicationsCatheter- related UTIs
Date senta5-29-036-20-038-20-0310-10-0310-30-03
Newsletters (date senta)11-27-032-6-044-7-046-7-049-18-04
a

Dates are approximate (within 1 week). There was a variable lag period between the discharge dates and the availability of data for analysis.

From: Confidential Performance Feedback and Organizational Capacity Building to Improve Hospital Patient Safety: Results of a Randomized Trial

Cover of Advances in Patient Safety: New Directions and Alternative Approaches (Vol. 2: Culture and Redesign)
Advances in Patient Safety: New Directions and Alternative Approaches (Vol. 2: Culture and Redesign).
Henriksen K, Battles JB, Keyes MA, et al., editors.

NCBI Bookshelf. A service of the National Library of Medicine, National Institutes of Health.