Water Sci Technol. 2013;67(5):1105-12. doi: 10.2166/wst.2013.657.

Operation and recovery of a seasonally-loaded UK waste stabilisation pond system.

Author information

  • 1Faculty of Engineering & Environment, University of Southampton, Southampton, UK.


An intermittent discharge waste stabilisation pond system was trialled for treatment of a seasonal wastewater load from a campsite. The system showed rapid acclimatisation to incoming load, with chlorophyll-a exceeding 700 mg l(-1) within 2 weeks and filtered and unfiltered effluent biochemical oxygen demand below 20 and 30 mg l(-1) respectively. Good performance continued for some weeks, after which photosynthetic oxygenation capacity in the first pond was seriously impaired by a shock loading believed to include fatty material. Inflow to the system was suspended and a surface film was broken up, after which the pond recovered within an 8-day period. Laboratory experiments indicated that interventions such as artificial aeration and dilution with effluent had no beneficial effect although mixing may have increased the rate of recovery.

[PubMed - indexed for MEDLINE]
PubMed Commons home

PubMed Commons

How to join PubMed Commons

    Supplemental Content

    Loading ...
    Write to the Help Desk