Display Settings:

Format

Send to:

Choose Destination
See comment in PubMed Commons below
J Environ Manage. 2008 Sep;88(4):1202-11. Epub 2007 Jul 23.

The lag daemon: hysteresis in rebuilding landscapes and implications for biodiversity futures.

Author information

  • 1Australian Centre for Biodiversity, School of Biological Sciences, Monash University Melbourne 3800, Australia. Ralph.MacNally@sci.monash.edu.au

Abstract

Many native bird species in production landscapes of south-eastern Australia demonstrably are declining, with loss of native vegetation as the major cause. Our biodiversity management objectives must be to increase the probabilities of persistence of birds that should occur in the landscape. To do so, there needs to be extensive amounts of new planting. However, one must be conscious that: (1) new planting in the impoverished soils and increasing aridity of southern Australia will take many decades to mature, and, also, will offer suitable habitats for a sequence of different species over the course of that maturation process; and (2) much existing vegetation is senescent or will be in a few decades' time. Recent landscape rebuilding models do not explicitly consider maturation time-lags. These hysteresis in habitat maturation may create 'bottlenecks' at future times (e.g. in 50 yr) that might prevent some species from persisting in whole landscapes even though such landscapes may be much more suitable in 100 yr than now. There are several critical issues: (1) species differ in habitat needs and even one species may require different kinds of habitats for foraging and for breeding; (2) landscapes must be conceived, and managed, as spatial and temporal mosaics to allow for persistence of the full set of species that should occupy them, meaning that senescing and replanted habitats may need to be juxtaposed; and (3) in certain particularly problematic landscapes, some highly productive agricultural lands may need to be used for providing habitat because maturation can be fast-tracked in fertile, well-watered locations. The problem is a complex one of scheduling and placement, and its optimization presents major theoretical and analytical challenges.

PMID:
17643736
[PubMed - indexed for MEDLINE]
PubMed Commons home

PubMed Commons

0 comments
How to join PubMed Commons

    Supplemental Content

    Full text links

    Icon for Elsevier Science
    Loading ...
    Write to the Help Desk